PSM 1 & PSM 2 ยท Logbook ยท Demo Day ยท Malaysia 2026

Final Year Project Help in Malaysia โ€” Marked on Process, Not Just the Report

PSM 2 is one semester long, and your proposal was approved in a semester when nothing had to be built yet. Most students are on a Sarjana Muda Kejuruteraan or Sains Komputer at UTM, UiTM or a politeknik โ€” four other subjects, a penyelia last seen in week three, and a demo date that will not move. We cut the scope to what one semester actually holds, then deliver original, AI-free chapters you can defend at pembentangan.

๐Ÿ““ Logbook Marks Protected ๐Ÿ”ง Build and Evaluation Planned ๐ŸŽค Demo & Poster Prepared ๐Ÿ’ต From RM 190 a Chapter
๐Ÿ“‹ Get Your Free PSM 2 Check

We check your scope against one semester, free

๐Ÿ“
1,400+
Proposals Written
๐Ÿ’ฌ
6 in 10
Come With SV Comments
โฑ๏ธ
6 Days
Average Turnaround
๐Ÿ”
Free
Revision After Feedback
Proposal formats we work with
UiTM university logo UKM university logo UPM university logo UTM university logo USM university logo UTHM university logo UTAR university logo MMU university logo Monash university logo Sunway university logo Taylor's university logo APU university logo INTI university logo UNITAR university logo OUM university logo WOU university logo

Independent service โ€” no university affiliation. ThesisHelper Malaysia is a private academic support provider. We are not affiliated with, endorsed by, accredited by or officially connected to any university, college or examination body shown above. All institution names and marks remain the property of their respective owners and appear here only to describe the proposal formats and submission requirements our writers work with.

Six Ways FYP Marks Disappear

Why Do Final Year Projects Lose Marks That Have Nothing to Do With the Report?

Six failures, and four of them cost you marks before you write a single chapter. FYP is assessed continuously, which is exactly what students discover too late.

๐Ÿ““

The Logbook Was Never Kept

Weeks of unsigned entries, then a rush to fill it in before submission. Those marks are allocated for supervision that happened at the time, and no amount of good writing later recovers them.

๐Ÿ˜

A PSM 1 Proposal Too Big for PSM 2

A system with six modules, a mobile app and a machine learning component, proposed in a semester when nothing had to be built yet. PSM 2 is one semester, shared with four other subjects and a job hunt.

๐Ÿ”ง

Built the System, Planned No Evaluation

A working prototype and nothing to say about whether it works better than what existed. In engineering and computing the evaluation carries as much weight as the build, and it cannot be added the week before.

๐Ÿ‘ค

The Supervisor Was Last Seen in Week Three

Meetings missed, updates unsent, then a panicked message in week eleven. Your supervisor usually sits on your assessment panel, and a student they have not seen is a student they cannot vouch for.

๐Ÿ’ผ

Industrial Training Ate the Semester

Internship, part-time work or a heavy elective load colliding with the only semester you have to finish. The clash is visible on the timetable in week one and almost nobody plans around it.

โฐ

The Report Written in the Final Fortnight

Everything left until after the demo, then twelve thousand words in two weeks. Panels can tell, Turnitin can tell, and the chapters that suffer most are the ones carrying the marks โ€” methodology and evaluation.

Already in PSM 2 and behind? Send what exists and your demo date. Most FYP rescues are about sequencing what is left, not writing faster.

Sequence What Is Left โ†’
Undergraduate-Level Work

Real FYP Deliverables, Not Advice โ€” From Your PSM 1 Proposal to Your PSM 2 Demo Script

Eight files you can open, order any one of them, and undergraduate budgets are not postgraduate ones.

๐Ÿ“

Scope Cut to One Semester of PSM 2

What can actually be built, tested and written between the proposal and the demo, given four other subjects. Most FYP rescues are simply this decision made a semester too late.

One SemesterFour Other Subjects
๐Ÿ“„

A Written Proposal Plus the Answers to Defend It

You receive the document and a one-page sheet of the questions a panel is likely to ask, with an answer for each. Most students prepare the proposal and prepare nothing for the fifteen minutes that decide whether it passes.

Panel-Ready15-Minute Defence
๐Ÿ“š

A Literature Review That Stops

Enough to justify your approach and no more. Undergraduate reviews are marked on relevance rather than volume, and where you need the full method our literature review help covers it properly.

Relevance Over VolumeNo Padding
๐Ÿ”ง

System Design and Build Documentation

Architecture diagrams, use cases, flowcharts, ERDs and testing tables written so a panel can follow what you built without watching the demo twice. The documentation is assessed, not just the code.

Diagrams & TablesPanel Can Follow
๐Ÿ“Š

A Testing Protocol You Can Actually Run

Written instructions, a participant script and a results table waiting to be filled in โ€” handed to you early enough that the sessions happen. Where the numbers need statistical treatment, see our SPSS data analysis help.

Decided EarlyData Exists
๐Ÿ““

A Weekly Agenda for Every Supervisor Meeting

A short list of what to show and ask each week, so you arrive with something real and your entry writes itself afterwards. We never write retrospective entries โ€” this is the tool that stops you needing them.

Signed at the TimeNever Backdated
๐ŸŽค

A Finished Poster, Slide Deck and Demo Script

Three files you can present from, including the order to click through so the working parts come first. Built to be read at two metres and to survive a projector nobody tested.

Reads at 2mDemo Sequenced
๐Ÿ‡ฒ๐Ÿ‡พ

Laporan PSM in Bahasa Malaysia

For programmes assessed in BM. Technical terminology stays consistent across every bab, with system and engineering terms kept in their standard English form and explained in BM the way a Malaysian panel expects to read them.

Dalam BMTerms Consistent

Only one chapter left?Methodology, evaluation or the literature review can each be ordered alone from RM 190 โ€” no package, no minimum.

Price One Chapter โ†’
How It Works

Our 5-Step Final Year Project Help Process โ€” From a Free Scope Check to Demo Day

About one PSM 1 proposal in three gets cut down after step two.

1
You Send the Proposal and the Dates
Your PSM 1 proposal or title, your demo and submission dates, and what else is on your timetable.
2
A Free Scope Check Comes Back
Whether that project fits one semester alongside your other subjects, and what to cut if not.
3
You Approve a Week-by-Week Plan
Build, evaluation and writing placed against your semester weeks, with meeting points marked.
4
Chapters Arrive as You Build
One at a time against the plan, so you have something real each week.
5
You Present, Poster and Slides Ready
Demo sequence, poster and presentation prepared for symposium day.

Step two costs nothing and cuts a third of proposals.Send the title and your demo date. Finding out in week two is a plan; finding out in week ten is an extension request.

Run My Scope Check โ†’
Before You Plan It

Plan Your Final Year Project Like a Thesis and You Lose Marks โ€” Four Differences Undergraduates Miss

Half the marks are not in the report.

โœ…

You Show Competence, Not Contribution

A thesis must add something to a field. An FYP shows you can run a project properly from problem to evaluation. Claiming novelty you cannot support wastes marks you would have earned by simply doing the work well.

๐Ÿ““

Half the Marks Are Not in the Report

Logbook, weekly supervision, proposal defence, progress presentation, demo and poster. A thesis is judged on the document; an FYP is judged on the semester, and those marks close as the weeks pass.

๐Ÿ”ง

In Engineering and Computing You Build

The deliverable is a working system, circuit or prototype with the report documenting it. Writing beautifully about something that does not run is the fastest way to lose a panel in the first five minutes.

โณ

You Have One Semester, Not Two Years

PSM 2 runs alongside four other subjects, often industrial training and a job hunt. Scope that would be modest for a master's dissertation is impossible here, and panels know that.

Been treating your FYP like a thesis?Send your assessment breakdown and which week you are in. You will get back what is already closed and what is still fully winnable.

Yes โ€” Show Me What I Can Still Win โ†’
Six Deliverables, Six Panels

Six Kinds of Final Year Project โ€” Which One Are You Actually Doing?

A panel that marks a build does not mark a portfolio the same way.

๐Ÿ”ง

Engineering and Computing โ€” You Build It

A system, app, circuit or prototype, documented with diagrams and testing tables, then evaluated against something. The demo carries the room, and the report proves you understood what you built.

Demo + DocumentationFrom RM 1,200
๐Ÿ”ฌ

Science and Social Science โ€” You Study It

A small empirical study analysed and written up in five chapters.

Five ChaptersFrom RM 980
๐Ÿ“Š

Business and Management โ€” You Analyse It

A case-based project diagnosing a real problem and recommending action.

RecommendationsFrom RM 880
๐ŸŽจ

Design and Creative โ€” You Make It

The deliverable is a portfolio and an exhibition rather than a report.

Portfolio + ExhibitionFrom RM 1,050
๐Ÿ“ˆ

Data and Analytics โ€” You Model It

A dataset, a model and a set of results, with nothing to demonstrate on a screen. Common in data science and actuarial programmes, and marked on whether your method was sound rather than on whether an interface exists.

No System to BuildFrom RM 1,100
๐Ÿงช

Health and Lab Sciences โ€” You Test It

Laboratory work or a small clinical study, bringing ethics clearance into an undergraduate timeline.

Ethics at UndergradFrom RM 1,150

Group FYP and Shared Marks

We work on your part and will not write a teammate's section, because panels ask each member what they personally did.

Diploma and Foundation Final Projects

Shorter, often a single chapter structure with a practical component, and marked mainly on whether the work was completed properly. The scope trap is smaller here but the timeline is tighter. Where the practical component is code, our FYP coding service covers building it and explaining it at the demo.

Found the one that matches your project?Tell us which of the six you are doing and your deadline. A fixed quote comes back the same day, with no obligation attached.

Get My FYP Quote Today โ†’
Four of These Close Early

Where Do Final Year Project Marks Actually Come From? Logbook, Poster, Viva and Five More

Most students find out about half of these in the final month, when four of them have already closed.

๐Ÿ““
The Logbook
Weekly entries signed by your supervisor at the time. These marks are awarded for supervision that happened, which is why they are the only ones that genuinely cannot be recovered later.
๐Ÿค
Supervision Attendance
Turning up, sending updates and arriving with something to discuss. Your supervisor usually sits on your panel, and their view of your semester is formed long before they read the report.
๐Ÿ›ก๏ธ
The PSM 1 Proposal Defence
A short presentation where a panel decides whether the project is achievable. Treated as a formality by students and used as a filter by departments.
๐Ÿ“ˆ
Mid-Semester Progress Review
A checkpoint showing something works. Arriving with slides and no running component is where panels start recommending a reduced scope.
๐Ÿ”ง
The Working Deliverable
The system, prototype or dataset itself. In engineering and computing this carries the single largest block of marks, and no report rescues something that does not run.
๐Ÿ“Š
Evaluation and Testing
Evidence that your deliverable does what you claimed, measured against something. Skipped more often than any other component and noticed by every panel.
๐Ÿ–ผ๏ธ
Poster and Symposium Day
A poster read from two metres by an assessor who has thirty of them to see. Designed the night before by most students, for marks that are entirely winnable.
๐ŸŽค
Final Presentation and Viva
Fifteen to twenty minutes, then questions about decisions you made months ago. Panels ask what you would change, and a good answer there recovers marks a weak chapter lost.

Not sure which components you have already lost?Send your assessment breakdown and where you are in the semester. Knowing what is still winnable changes what you should work on tonight.

Map My Remaining Marks โ†’
4,200+
Final Year Projects Supported
Free
PSM 2 Scope Check
1 in 3
Proposals Cut Down
Who You Work With

Experienced FYP Writers in Malaysia โ€” Specialists in Final Year Project Assessment

All three sit on assessment panels, so the marks they protect in your report are the ones they award in someone else's.

Available Now
Sharifah Nadia binti Syed Ahmad
Undergraduate FYP Support
โ˜…โ˜…โ˜…โ˜…โ˜…4.8ยท 480+ projects

๐ŸŽ“MEd Curriculum & Instruction, Universiti Pendidikan Sultan Idris (UPSI)

๐Ÿ•7 years supporting Malaysian students ยท Bahasa Malaysia ยท English

Helps With
  • โœ“Final year project scoping and planning
  • โœ“Chapter 1 to 5 structure for undergraduate work
  • โœ“Simple, defensible statistics for FYP data
  • โœ“Working to a single-semester timeline

"An FYP does not need to be original research. It needs to be complete, honest and finished on time."

Work with Sharifah โ†’
Available Now
Dr. Shahrul Nizam Idris
Engineering Builds, Testing & Demo Day
โ˜…โ˜…โ˜…โ˜…โ˜…4.9ยท 940+ projects

๐ŸŽ“Doctorate in electrical engineering

๐Ÿ•Assesses FYP panels and symposium posters

Helps With
  • โœ“Prototype scope cut to one semester
  • โœ“Testing tables and evaluation against a benchmark
  • โœ“Demo sequences that show working parts first
  • โœ“Posters an assessor can read at two metres

"I watch students demo the broken feature first because they spent longest on it. Show me what works, then tell me what did not."

Work with Shahrul โ†’
Available Now
Dr. Meena Krishnan
Computing Projects & System Documentation
โ˜…โ˜…โ˜…โ˜…โ˜…4.8ยท 810+ projects

๐ŸŽ“Doctorate in software engineering

๐Ÿ•Sits on PSM 2 assessment panels and supervises both cohorts

Helps With
  • โœ“Use cases, ERDs and architecture diagrams
  • โœ“Usability testing planned before the build starts
  • โœ“Proposals trimmed from six modules to two
  • โœ“Laporan PSM dalam Bahasa Malaysia

"Every PSM 1 proposal has a machine learning module in it. About one in ten still has one by the demo."

Work with Meena โ†’
Available Now
Dr. Lau Chee Ming
Science, Business & Study-Based Projects
โ˜…โ˜…โ˜…โ˜…โ˜…4.9ยท 760+ projects

๐ŸŽ“Doctorate in applied science

๐Ÿ•Chairs undergraduate project assessment

Helps With
  • โœ“Questionnaire studies sized for one semester
  • โœ“Five-chapter reports for science programmes
  • โœ“Business case projects with usable recommendations
  • โœ“Answers to the questions panels ask every year

"Undergraduates apologise for a small study. A small study done properly outscores an ambitious one that never finished."

Work with Ming โ†’
Available Now
Ravinesh Kumar
Computer Science & IT Research
โ˜…โ˜…โ˜…โ˜…โ˜…4.8ยท 260+ projects

๐ŸŽ“MSc Computer Science, Multimedia University (MMU)

๐Ÿ•9 years supporting Malaysian students ยท English ยท Tamil

Helps With
  • โœ“Information systems methodology & justification
  • โœ“System design and evaluation chapter writing
  • โœ“Literature review for computing & technology topics
  • โœ“Formatting to Malaysian computing faculty standards

"IT students often have the best research. Sometimes they just need help translating it into academic language that examiners can assess."

Work with Ravinesh โ†’

Build, study or case project?Say which yours is and it goes to the assessor who marks that kind, before anything is charged.

Match Me to an Assessor โ†’
The Difference

What Decides an FYP Before a Panel Even Opens the Report? Six Things

Undergraduate projects are won across a semester, not in the final fortnight.

๐Ÿ“

Scope Is Cut Before You Start Building

About one PSM 1 proposal in three gets reduced after our free check, and every reduction happened before a semester was spent on a module that would not have been finished.

๐Ÿšซ

We Will Not Backdate a Logbook

Those marks belong to supervision that took place, and inventing entries is the one thing on an FYP that turns a low mark into a disciplinary matter. Our count of backdated logbooks stays at zero.

๐Ÿ“Š

Evaluation Is Designed Before the Build

Deciding how you will prove it works, while there is still time to collect what that proof needs. Students who leave evaluation to the end have a working system and nothing to say about it.

๐Ÿ“†

The Plan Includes Your Other Four Subjects

PSM 2 does not happen in isolation. A week-by-week plan built as though FYP is your only commitment is a plan you abandon by the third assignment deadline.

๐ŸŽค

Demo Day Is Prepared, Not Improvised

Poster, slides and a demo order that opens with what works. These are winnable marks that almost every student leaves on the table by preparing them the night before.

๐Ÿ—ฃ๏ธ

We Tell You When a Repeat Semester Is the Safer Call

Sometimes a proposal genuinely cannot be completed in the weeks left, whatever is cut. Hearing that in week four means a reduced scope; hearing it in week twelve means a repeat semester.

Ready to hand the writing over and get back to building?Fill in the form with your title, your demo date and what already works. Your scope check comes back free within two days.

Hire FYP Help Now โ†’
Real Outcome

Case Study: An FYP Proposed With Six Modules, Demoed With Three

StudentA.H.
ProgrammeBSc Software Eng
StagePSM 2, Week Five
DeliverableWeb System
โœ“ Demonstrated and Passed
๐Ÿ”ด The Problem

A.H. had a PSM 1 proposal for a campus event system with six modules, including a recommendation engine and a mobile companion app. He was in week five of PSM 2 with two modules half-built, four other subjects, and a demo in week thirteen. He had not opened his logbook since week two, and his supervisor had last heard from him before the mid-semester break.

๐Ÿ”ต What We Did

The free scope check took a day and said what he already knew. The recommendation engine and the mobile app came out entirely โ€” both were the parts he was proudest of and neither could be finished, tested and documented in eight weeks. Two modules stayed, with a third added only because it was small and made the demo tell a complete story. The evaluation was decided that week rather than in week twelve: usability testing with fifteen students, planned early enough that the sessions actually happened. His logbook could not be repaired and we did not try; instead he restarted it honestly from week five with a note explaining the gap, and met his supervisor weekly from then on. The report was written alongside the build rather than after it, one chapter per fortnight.

๐ŸŸข The Result

Three modules demonstrated, all working, with usability data behind them. He lost the logbook marks from weeks two to five and nothing else. His panel asked why he had dropped the recommendation engine and he answered honestly, which read as judgement rather than failure.

Proposal bigger than your semester?Send the module list and your demo date. Cutting in week five is a decision; cutting in week eleven is damage control.

Cut My Scope Now โ†’
Sample Work

Three Final Year Projects Rescued Before Demo Day, Inside One Semester

Project 01 ยท BSc Software Engineering
Campus Event System, Cut From Six Modules to Three
PSM 2 week five ยท usability testing ยท demo passed
Arrived With

Six proposed modules, two half-built, eight weeks left, four other subjects and a logbook untouched since week two.

What Was Done

Recommendation engine and mobile app dropped, evaluation decided immediately, logbook restarted honestly, report written alongside the build.

Why It Worked

Three working modules with data behind them beat six half-built ones with none.

Project 02 ยท BEng Mechanical
A Prototype That Ran but Proved Nothing
Testing designed late ยท benchmark added ยท week nine
Arrived With

A finished prototype and no evaluation plan, four weeks before the demo, with nothing to compare the results against.

What Was Done

A benchmark identified from existing literature, a testing protocol written for the time remaining, and results tabulated against it.

Why It Worked

The build was never the problem. Having nothing to measure it against was.

Project 03 ยท Sarjana Muda Sains
Kajian Soal Selidik yang Terlalu Besar untuk Satu Semester
400 responden โ†’ 120 ยท lima bab ยท dalam BM
Arrived With

A questionnaire study targeting 400 respondents across three campuses, planned by a student with one semester and no transport.

What Was Done

Reduced to one campus and 120 reachable respondents, sample justified properly, and the five-chapter report written in BM alongside collection.

Why It Worked

A reachable sample answered his question. An unreachable one would have answered nothing.

Recognise your project in one of those three?Send yours the same way they did โ€” title, deadline, and what is finished so far. The first reply costs nothing.

Rescue My Project Too โ†’
Student Reviews

4.9 From 4,200 Malaysian FYP Students โ€” โ€œMy Logbook Was Emptyโ€

โ˜…โ˜…โ˜…โ˜…โ˜…

"This was my FYP and I was completely lost on where to even start. They helped me narrow the topic to something I could actually finish in one semester, then structured all five chapters. I graduated on time."

AI
Aina Izzati Bachelor of Psychology ยท UM
โœ“ FYP Completed On Schedule
โ˜…โ˜…โ˜…โ˜…โ˜…

"Honest people. I asked them to do more than my timeline allowed and they told me no, then explained what was realistic. I respected that more than if they had just said yes and missed it."

TW
Tan Wai Kit Bachelor of Engineering ยท UTHM
โœ“ Realistic Scoping
โ˜…โ˜…โ˜…โ˜…โ˜…

"My topic was too broad and I did not realise it. They cut it down to something specific and researchable before I wasted a semester collecting the wrong data."

AH
Amirul Hakim Bachelor of Business ยท UTAR
โœ“ Topic Narrowed Early
โ˜…โ˜…โ˜…โ˜…โ˜…

"Simple, defensible statistics for an undergraduate project โ€” exactly what I needed, not the overcomplicated analysis I was trying to force. My supervisor said it was the cleanest results chapter in my cohort."

LY
Low Yi Xuan Bachelor of Psychology ยท HELP
โœ“ Clean FYP Results
โ˜…โ˜…โ˜…โ˜…โ˜…

"Six modules in my proposal, two half-built, eight weeks left. Nobody had counted the weeks when it was approved."

AH
Aiman H. BSc Software Eng ยท Selangor
โœ“ Cut to Three Modules
โ˜…โ˜…โ˜…โ˜…โ˜…

"They refused to fill in my logbook. I lost those marks and kept my place on the programme, which was the trade."

JS
Jaswinder S. BEng Electrical ยท Penang
โœ“ Restarted It Honestly
โ˜…โ˜…โ˜…โ˜…โ˜…

"My prototype ran perfectly and I had nothing to compare it against. The build was never the problem."

LY
Lee Y. BEng Mechanical ยท Johor
โœ“ Benchmark Added Late
โ˜…โ˜…โ˜…โ˜…โ˜…

"I demoed the broken feature first because I had spent the longest on it. Nobody had told me to open with what works."

NF
Nurul F. BSc IT ยท Melaka
โœ“ Demo Resequenced
โ˜…โ˜…โ˜…โ˜…โ˜…

"Industrial training and PSM 2 in the same semester. My plan assumed I had free afternoons that never existed."

RK
Ravin K. BSc Computing ยท Cyberjaya
โœ“ Plan Matched Timetable
โ˜…โ˜…โ˜…โ˜…โ˜…

"Saya sasarkan 400 responden dari tiga kampus. Saya tiada kereta dan satu semester sahaja."

MI
Mohd Irfan Sarjana Muda Sains ยท Kedah
โœ“ 120 Responden Dicapai
โ˜…โ˜…โ˜…โ˜…โ˜…

"My panel asked what each of us built. In a group project that question separates you very quickly."

TY
Tan Y. BSc Software Eng ยท KL
โœ“ Own Part Defended
โ˜…โ˜…โ˜…โ˜…โ˜…

"I left the poster until the night before. Those were free marks and I gave away most of them."

SA
Syafiqah A. BSc Biotech ยท Perak
โœ“ Poster Taken Seriously

4,200 students started with the same form.Two minutes to fill in, one free scope check back, and a fixed price before you commit to anything at all.

Fill the Form, Get FYP Help โ†’
Free Scope Check

Final Year Project Prices in Malaysia From RM 190 โ€” Transparent Chapter-Based Pricing

Undergraduate prices, because undergraduate budgets are not postgraduate ones.

FYP ServiceScopeStarting FromTypical Turnaround
PSM 2 Scope and Feasibility Check Any Project Free 1โ€“2 Days
Single Chapter โ€” Literature or Methodology Per Chapter RM 190 3โ€“5 Days
Poster and Presentation Slides Symposium Day RM 320 2โ€“4 Days
PSM 1 Proposal and Defence Preparation Panel-Ready RM 450 1โ€“2 Weeks
Evaluation and Testing Plan Before You Build RM 480 4โ€“7 Days
System Design and Build Documentation Diagrams + Tables RM 620 1โ€“2 Weeks
Business or Case-Based FYP Full Project RM 880 3โ€“5 Weeks
Science or Social Science FYP Five Chapters RM 980 4โ€“6 Weeks
Design or Creative FYP Portfolio + Exhibition RM 1,050 4โ€“6 Weeks
Data or Analytics FYP Dataset + Model RM 1,100 4โ€“7 Weeks
Health or Lab Sciences FYP Ethics + Lab Work RM 1,150 5โ€“8 Weeks
Engineering or Computing FYP Build + Report RM 1,200 5โ€“8 Weeks

The scope check is free because it decides whether the rest is worth buying, and about one proposal in three gets cut after it. Nothing here includes a logbook, because those marks belong to supervision that actually happened and we do not write retrospective entries. Where language rather than content is the issue, our proofreading and editing services are priced per thousand words and usually cheaper.

Free scope check first Plan includes your other subjects Evaluation designed before the build Chapters delivered as you go Poster and demo prepared No logbook ever backdated
FAQ

Final Year Project Help Malaysia โ€” Frequently Asked Questions

The scope check is free. A single chapter starts at RM 190, a poster and slide deck RM 320, a PSM 1 proposal with defence preparation RM 450, an evaluation plan RM 480 and system documentation RM 620. Complete projects start at RM 880 for business, RM 980 for science and RM 1,200 for engineering or computing builds.

No. A thesis must contribute something to a field; an FYP shows you can run a project properly from problem to evaluation. It runs across two semesters rather than years, roughly half the marks sit outside the report in logbooks, presentations and the demo, and in engineering or computing the deliverable is a working system rather than a document.

Usually yes, and reducing scope early reads as judgement rather than failure. Panels approve proposals on whether the idea is sound, not by counting your weeks โ€” so an over-scoped proposal is common and expected. Tell your supervisor before you fall behind rather than after, and cut the components that cannot be built, tested and documented in the time left.

Restart it honestly from today and accept the marks already lost. We will not write retrospective entries and no service should, because inventing supervision that did not happen turns a low mark into an academic misconduct case. A logbook restarted openly with a note about the gap is recoverable; a fabricated one is not.

Commonly 8,000 to 15,000 words depending on your faculty and project type, which is far shorter than a dissertation. Check your own handbook, and remember that a tight report with proper evaluation marks better than a padded one. Length is rarely where FYP marks are lost.

Evaluation is usually worth as much as the build, and it is the component students skip most. Usability testing, accuracy measures, a benchmark comparison or a user survey all work โ€” what matters is deciding which one at proposal stage, so the data exists when the report needs it. A system that runs and proves nothing loses marks a working system should have earned.

What you would change, why you chose this approach over an alternative, what your evaluation actually shows, and which parts you built yourself. In group projects they ask each member what they personally did. Answering a limitation honestly recovers more marks than defending something the evidence does not support.

With your own part, yes. Individual contribution is usually assessed separately through logbooks and viva questions, so panels ask each member what they personally did. We will not write a teammate's section, and a member who cannot explain their own component is exposed in the first two questions.

Send a short written update anyway, and keep sending them. A record of attempted contact protects you, and supervisors respond to a specific question far more reliably than to a request for a meeting. If it continues, your programme coordinator would rather know in week six than in week twelve.

Yes, at the same rates. Technical terminology stays consistent across every bab, with system and engineering terms kept in their standard English form and explained in BM โ€” which is how Malaysian panels expect to read them rather than seeing translated technical labels nobody uses.

It cannot build your system, run your testing or sit in your demo, which is where most of your marks are. What it produces is a report about a project rather than a report about yours โ€” generic architecture, evaluation results from nowhere, and no answer when a panel asks why you chose this database over another. Your FYP is defended live.

Increasingly yes, usually alongside the Turnitin similarity check at submission. Policies differ between Malaysian universities and faculties, so read your own programme rules rather than what a senior told you last year. Where a flag needs addressing properly, our AI content removal service starts with a free diagnostic.

Put your project back into it. Generated chapters are flagged because they describe a system in general โ€” name your actual modules, your framework and version, your testing numbers, the bug that changed your design in week seven and what your fifteen test users said. That removes most generated text and fixes the vagueness a panel would have questioned anyway.

Only the person assigned to you. Your report, code and evaluation data are used solely for your project, never reused, never shared with another student, and deleted once the order closes. Nothing identifying you or your university is retained afterwards.

Not sure what is still winnable this semester?Send your assessment breakdown and your demo date.

๐Ÿ’ฌ WhatsApp Your FYP
๐Ÿšจ Demo Day Close

Demo in Three Weeks and the System Still Not Running?

Send what works, what does not and your demo date. You'll get an honest answer on what can still be finished and demonstrated โ€” and what to cut tonight so the rest holds.